Print this page         FR   EN  
 Presentation  Companies of the SONACA Group  Activities  Programs  Press room  Jobs  Contacts  Links  Extranet  Privacy Policy
   Companies of the SONACA Group > SONACA S.A. > Programs  

Key Figures
Programs
Contacts

 

   

 

 
Parc Industriel
Route Nationale 5
BE 6041 Gosselies
 
Aircrafts pictures : © AIRBUS, BOMBARDIER, DASSAULT, EMBRAER, GULFSTREAM, LOCKHEED MARTIN, RAYTHEON

+32 71 25 51 11
+32 71 34 53 55

 

 

Programs and activities


 

Customer:  AIRBUS

 

Aircraft:  A320, A330/340, A340-500/600 families

 

Tasks:

Development, manufacturing, assembly and tests of the wing leading edges and their associated de-icing system.

 

Customer:  AIRBUS

 

Aircraft: A380

 

Tasks:

Development, manufacturing, assembly and tests of the wing leading edges (and their associated de-icing system) and of the Nose Upper Shell (fuselage section located above the cockpit).
Manufacturing and assembly of the Frame 5 (Protective Shield).

Customer: EMBRAER

 

Aircraft: ERJ 135/145, Legacy

 

Tasks:

Development, manufacturing, assembly and tests of the wing leading edges and their associated de-icing system.
Development of the center fuselage section, the rear fuselage, the baggage and associated access doors and the engine pylons. SONACA Gosselies also produces the panels and some small parts of these subassemblies.

Customer: EMBRAER

 

Aircraft:  EMB 170/190

 

Tasks:

Development, manufacturing, assembly and tests of the wing leading edges and their associated de-icing system, of fuselage panels (CFII) and of the Keel Beam.

Customer: DASSAULT Aviation

 

Aircraft: Falcon 7X

 

Tasks:

Development, manufacturing, assembly and tests of the moveable and fixed wing leading edges and associated de-icing system, as well as of the front spar.

 G 180 SP  

Customer: GROB

 

Aircraft: G180 SP

 

Tasks:

Development and manufacturing of de-iced wing leading edges.

UAV-B HUNTER (Unmanned Air Vehicule)

 

Through the EAGLE Consortium

 

Tasks:

Certification and manufacturing of the composite wings.

Manufacturing, assembly and tests of airplanes.

Ground Control Stations.

Systems integration and testing (including flight tests).

 

Customer: AIRBUS MILITARY

 

Aircraft: A400M

 

Tasks:

Development, manufacturing, assembly and tests of the wing leading edges and their associated de-icing system, the main landing gear doors, the nose section protective shield and engine cowlings.

Space Activities

 

Customers: CNES, ESA, NASA, ...

 

Programs:

Hermes, ARD, GSTP, FESTIP, CRV, X38, SPOT 5, Colombus, Mars Beagle 2, Aladin, Corot, Pléiades